摘要
结合infi— 90的SCS系统在湛江电厂二期 2× 30 0MW机组的应用情况 ,分析其软件结构 ,着重阐述调试中改进与完善。
Through SCS system of infi-90 is applied at sencond phase two 300MW units by Zhanjiang power plant and analyzed its software structure. Improvement and perfcction are discussed ti stress during adjusting test
出处
《江西电力》
2001年第4期27-29,共3页
Jiangxi Electric Power