大跨径连续刚构箱梁剪力滞效应分析 被引量:21

Analysis of Shear Lag Effect of Long-Span Continuous Rigid-Frame Box-Beam Bridges
下载PDF
导出
摘要 结合荷载等效分解方法 ,首先分析大跨径连续刚构在垂直荷载作用下产生剪力滞后效应的机理 ,其次采用三杆比拟法建立箱梁剪力流平衡微分方程 ,最后结合静载试验实测纵向应力数据 ,分析泸州长江二桥连续刚构主要控制截面的剪力滞系数。 The equivalent load resolution method was used in the study. The mechanism of shear lag effect of long span continuous rigid frame induced by vertical loads are discussed. The shear flow equilibrium equations of the box beam are derived by use of three rod analogous procedure. The shear lag coefficients of the main controlling cross sections of the continuous rigid frame of Luzhou Second Bridge over the Yangzi River are obtained based on static loads measured on site.
出处 《西南交通大学学报》 EI CSCD 北大核心 2001年第6期617-619,共3页 Journal of Southwest Jiaotong University
关键词 设计荷载 应力分析 连续刚构 剪力滞效应 桥梁 箱梁 墩梁固结 荷载等效分解方法 design loads stress analysis continuous rigid frame shear lag
  • 相关文献

参考文献4

  • 1张士铎.变高度梯形单室箱梁畸变计算[J].土木工程学报,1987,(4):30-34.
  • 2王文涛,刚构连续组合梁桥,1995年,203页
  • 3张士铎,土木工程学报,1987年,4期,30页
  • 4张士铎,桥梁设计理论,1984年,50页

同被引文献112

引证文献21

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部