摘要
在对煤气管道的坡度和挠度进行分析的基础上,针对当前国内大中型联合企业煤气净化与输配的实际情况,提出了煤气管道无坡度敷设的前提条件,并给出了根据管道的坡度与挠度之间的关系计算管道事故荷载及跨距的方法。
Based on analysis of the slope and bending deflection of gas pipeline, preconditions for laying of the gas pipeline horizontally in the light of the actual situation of purification and distribution of gas of the domestic large and middle-sized metallurgic integrated enterprises. The calculation method for load and track of the pipeline failures according to the relations between slope and bending deflection of the pipeline system is given.
出处
《冶金动力》
2001年第6期14-15,18,共3页
Metallurgical Power