198 9~ 1998年三门峡水电站进行了 10年汛期浑水发电试验。除进行材料试验解决了抗磨蚀问题以外 ,重点提出了“洪水排沙 ,平水发电”的运用方式。通过试验运用证明 ,“洪水排沙 ,平水发电”可有效提高汛期发电运行小时数和水量利用率 ,虽然汛期发电天数小于全汛期发电时汛期平均发电天数 。
In 1989~1998, prototype experiments were done in the Sanmenxia hydropower station to make a good use of sand laden flow for electricity generation. After the experiments, problems of abrasion to the generators have been eliminated, and, more importantly, a new operation mode, i.e., sand discharging in flood seasons while electricity generating by average flow, has been proven able to increase electricity production and water use efficacy.
出处
《人民黄河》
CAS
北大核心
2002年第1期39-40,共2页
Yellow River
关键词
发电运行时数
水量利用率
汛期
三门峡水电站
electricity generation hours
water use efficacy
flood season
the Sanmenxia hydropower station