摘要
结合丰城电厂 4× 3 0 0 MW机组 ,对原有的锅炉给水控制系统及汽包水位测量、运行方式、参数整定等的工作原理进行了分析 ,并结合现场实际情况 ,对汽包水位参数的测量、运行方式的切换以及系统参数的调整进行了改进 。
The principles of the boiler feedwater automatic control system for 4× 30 0 MW units in Fengcheng power plant are analyzed.According to the worksite condition,the original boiler feedwater automatic control system,and its m easuring method of drum water level,operation mode and param eters were modified. The improved system is quite effective.
出处
《电力系统自动化》
EI
CSCD
北大核心
2002年第4期67-69,共3页
Automation of Electric Power Systems