摘要
通过对湘钢高炉可能使用的几种炉料结构的熔滴性能和还原性能的试验研究表明 ,湘钢二烧二期工程合理的炉料结是采用 78%烧结矿 +1 5 %澳矿
Through test and research on the reducing and fusibility of several charge structures which will be used at the blast furnace division of Xianggang,it have been proved that the blast furnace charge structure will be sinter ore 78%+Australia ore 15%+pelletizing 7% after the second stage of engineering of the sinter division No 2 at Xiangtan Iron & Steel Group Co,Ltd completes.
出处
《湖南冶金》
2001年第5期9-12,44,共5页
Hunan Metallurgy