摘要
在先张法预应力空心板的施工中 ,利用钢绞线割下的余料做吊环 。
During the construction of the pre\|tentioned prestressed concrete slabs, it is one feasible way to reduce the cost of construction that the remainder of the cut\|out stee cable can be used for making the slinger rings.
出处
《内蒙古公路与运输》
2001年第3期22-23,共2页
Highways & Transportation in Inner Mongolia