摘要
通过对帽子山隧道施工阶段的监理,论述了隧道施工各工序的质量监控方法及要点,并对一些主要环节提出了加固措施以保证隧道质量。
Through the supervision of the Maozi Mountain tunnel construction section, this paper discusses the quality monitoring methods and the key points of all procedures in the tunnel construction, and proposes the reinforcement measures in some main links for purpose of having good tunnel quality.
出处
《济南交通高等专科学校学报》
2001年第4期50-53,共4页
Journal of Jinan Communications College
关键词
隧道
施工监理
质量控制
tunnel
wall rock
supporting
jet
lining
model pouring cement
supervision