摘要
长湖水电厂2#进水口事故闸门自70年代投入运行以来,先后4次在洪水期发生闸门滑落事故,造成闸门拉杆、启闭设备损坏,影响机组正常运行,经济损失巨大。为此,受电厂委托对该闸门进行动态测试。本文简要介绍了事故情况、测试成果,并根据测试成果对2#事故闸门的事故成因做较全面的分析。
The emergency gate of No.2inlet of Changhu Hydropower Station occurred four accidents of gate drop in flood season since it has been put into operation in1970which resulted in destroying the arm and hoist facilities and influenced the unit's normal operation.Therefore,we have been authorized to have gate tested dynamically.This paper briefly introduced the accidents and test effect.It also briefly analyzed the cause of accident according to check result.
出处
《大坝与安全》
2001年第5期49-52,共4页
Dam & Safety
关键词
进水口
事故闸门
检测
长湖水电站
accident introduction,test,effect,cause analysis