摘要
介绍了深圳一高层建筑的空调设计概况以及风冷热泵冷水机组机房的设计安装。分析了工程安装调试中出现的机房温度过高的原因 ,提出并通过评估确定了最佳的解决方案。
Outlines the air-conditioning design and the installation of the air-cooled heat-pump water chiller unit in a high-rise building in Shenzhen. Analyses the causes for high temperature in the plant room during construction and commisioning of the unit. Puts forward an optimum option to solve the problem.
出处
《暖通空调》
北大核心
2001年第6期55-57,共3页
Heating Ventilating & Air Conditioning
关键词
高层建筑
空调设计
风冷热泵冷水机组
机房
通风
散热
high-rise building, air-conditioning design, air-cooled heat-pump water chiller unit, plant room, ventilation, heat emission