期刊文献+

三峡-葛洲坝梯级电站模型中自动控制及测量系统的应用

Application of automatic control and measurement system in TGP-GP step power station model
下载PDF
导出
摘要 三峡 -葛洲坝梯级电站联合调度水力学模型试验中 ,三峡电站下泄流量日变化幅度较大 ,葛洲坝电站反调节时流量大而水头较低。针对上述特点 ,分别采用不同的设计原理和控制方法 ,较好地解决了两电站流量的自动控制问题 ;针对两坝间及葛洲坝下游非恒定流水力学参数的测量 ,采用超声水位传感器和二维流速传感器实现了集中实时测量并自动处理输出 ,软件采用模块设计。整个系统简单、清楚、高效 。 In the Three Gorges Project (TGP) Gezhouba Project(GP) step power station cooperation hydraulics model test, daily Changing amplitude of TGP power stations releasing discharge is large and that of Gezhouba Project in its reverse regulation is huge with low water head. Aiming at the above mentioned features, different design principles and control methods have been adopted respectively to solve the automatic discharge control problems for two power stations. For the measurement of unsteady flow hydraulics parameters in river between two dams and downstream Gezhouba reach, the supersonic water level sensors and two dimension velocity sensors were used to realize concentrative measurement in real time and automatic data processing. The software adopted modular design. The whole system is simple, clear and efficient. An application example for showing the automatic control and measurement is given.
作者 董红燕 柏林
出处 《长江科学院院报》 CSCD 北大核心 2002年第1期56-58,共3页 Journal of Changjiang River Scientific Research Institute
关键词 实时监控 流量控制 水位 流速测量 梯级水电站 自动控制 supervisory control in real time discharge control water level and velocity measurement system
  • 相关文献

参考文献2

  • 1李发政.三峡电站汛期调和峰对航运的影响初步试验研究[M].武汉:长江科学院,2000..
  • 2廖勇龙.三峡电站日调节模型葛洲坝下泄流量控制及水位同步测量系统[M].武汉:长江科学院,1991..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部