摘要
介绍广州地铁越秀公园站基坑开挖中采用的人工挖孔桩桩外垂直注浆截水帷幕和基底水平注浆帷幕施工技术。
In the construction of foundation ditch excavation of Yuexiu Park Station of Guangzhou Subway, engineers adopted pore\|excavation, out of which vertical\|grouting water\|seal curtain and bottom horizontal\|grouting water\|seal curtain were adopted.
出处
《施工技术》
CAS
北大核心
2002年第1期31-33,共3页
Construction Technology
关键词
灌浆止水
截水帷幕
人工挖孔桩
基坑围护
施工方法
地下铁路
grouting water\|seal
water\|seal curtain
manual pore\|excavation pile
foundation ditch shoring
construction method
subway