摘要
对开山石填海挤淤区挤淤形成的非均匀软弱地基进行处理时 ,由于工程性质很差、厚度较大、沉降固结历时较长且数值较大的淤泥层位于开山石回填层之下 ,地基处理比较困难。本文介绍了一个经济、合理的地基处理方法 。
It is difficult to treat the uneven soft foundation in site\|extruding area by excavating hills to fill up the seabeach because the silt under the backfill rocks has bad geotechnical engineering characteristics. This article gives an example of foundation treatment that is economical and reasonable. The experience is very useful for the same projects in the coastal silt.
出处
《水文地质工程地质》
CAS
CSCD
2002年第1期54-57,共4页
Hydrogeology & Engineering Geology
关键词
开山石填海挤淤
非均匀软弱地基
强夯挤淤法
预制混凝土管桩
沉降固结
地基处理
site\|extruding area excavating hills to fill up the seabeach
uneven soft foundation
the method of heavy tamping and silt compassion
pre\|fabricated concrete tube pile