摘要
介绍了两台铜质冷凝器的材料、焊接、管板加工、设备的组合等制造工艺过程。该设备通过管壳程水压试验 ,各项检验合格 ,制造取得成功。
The manufacturing technologies of two copper condensers,such as material selection,welding,processing of tube sheets,assembly, were presented. The inspection indexes of the condensers were qualified in a water pressure test of tube side and shell side.
出处
《化工机械》
CAS
2001年第4期215-217,共3页
Chemical Engineering & Machinery
关键词
钢冷凝器
焊接
制造技术
Copper Condenser,Welding,Manufacturing Technology