摘要
介绍了中小型工程基坑开挖中遇到的不同地质条件所采取的相应的工程处理措施 。
This paper introduces the different geological conditions and the suitable project measures in middle and small types of project foundation pit excavating,it also researched the stabilization calculating when the weaving bags are used as temporary slope protection and soil guard wall.
出处
《黑龙江水专学报》
2001年第2期60-61,共2页
Journal of Heilongjiang Hydraulic Engineering College