摘要
应用建立的电网络模型对青年水库土坝截渗方案进行了研究,模拟出了多种截渗方案下的工程效果参数,并由此提出该 工程防渗设计方案建设。
This paper researched the plan to cut off seepage on earth dam in Qingnian Reservoir in utilizing constructed electricity net model, initated engineering effect parameters under many kinds of plans to cut off seepage and posed the suggestion of this engineering
出处
《黑龙江水专学报》
2001年第3期41-43,共3页
Journal of Heilongjiang Hydraulic Engineering College