摘要
介绍了七星河治理工程中,施工难段处理的几种施工方法,仅供同行参考。
This paper introduced several constructive methods to deal with troublesome section during the couse ofQixing River regulation project. And it can be a reference for person of the same profession to contrast.
出处
《黑龙江水专学报》
2001年第3期116-117,共2页
Journal of Heilongjiang Hydraulic Engineering College