期刊文献+

虚拟制造环境下基于多智能体的敏捷调度策略的研究 被引量:3

Research of Multi-agent Agile Scheduling Model in Virtual Manufacturing Unit
下载PDF
导出
摘要 该文针对虚拟制造环境下生产作业调度,把多智能体系统的分布式结构和层次式结构有机地结合起来,提出基于多Agent的虚拟环境下车间生产敏捷调度的混合层次结构。 This paper aims at the operation scheduling of virtual manufacturing unit,based on Multi-Agent technology,puts forward the mixed hiberarchy model for virtual job shop agile scheduling,and recommends the negotiation protocol to bid for jobs.
出处 《计算机工程与应用》 CSCD 北大核心 2002年第3期74-76,95,共4页 Computer Engineering and Applications
基金 国家自然科学基金"两个基地"项目(编号:5991076861) 中国-新加坡"中新联合研究计划"项目 国防预研基金项目(编号:99J18.1.3JW0526)
关键词 虚拟制造 多智能体 谈判协议 敏捷调度策略 CIMS Virtual Manufacturing,Multi-Agent ,Scheduling,Negotiation Protocol
  • 相关文献

参考文献2

二级参考文献8

  • 1[1]SHAW J P. The design of a distributed knowledge_based approach for the intelligent manufacturing information system [D]. PhD thesis,West Lafayette, IN:Purdue Univ.,1984.
  • 2[2]UPTON D M. The operation of large computer controlled manufacturing system[D].PhD thesis,West Lafayette, IN: Shool of Industrial Engg.,Purdue Univ.,Dec.1988.
  • 3[3]TILLEY K J,WILLIAMS D J.Modeling of communications and control in an auction-based manufacturing control system[C]. Proc. Of 1992 IEEE Int'l Conf. On Robotics and Automation, Nice, France.
  • 4[4]JAYAMOHAN M S, RAJENDRAN C.New dispatching rules for shop scheduling: a step forward[J].International Journal of. Production Research, 2000,38(3):563-586.
  • 5[5]VEPSALAINEN A P J,MORTON,T E.Priority Rules for job shops with weighted tardiness costs[J]. Management Science,1987,33:1035-1047..
  • 6[6]CARROLL D C.Heuristic sequencing and multiple component jobs[D]. Unpublished PhD dissertation, Massachusetts Institute of Technology, Cambridge, MA.1965.
  • 7[7]BAKER K R,KANET J J.Job shop scheduling with modified due dates[J]. Journal of Operations Management, 1983,4:11-22.
  • 8[8]BAKER K R,BERTRAND J W M.A dynamic priority rule for sequencing against due-dates[J]. Journal of Operations Management, 1982,20:27-45.

共引文献11

同被引文献18

  • 1温泳棠.制造资源计划系统[M].北京:机械工业出版社,1994..
  • 2R J Rabelo,L M Camarinha-Matos.Multi-agent-based Agile Scheduling[J].Robotics and Autonomous Systems,1999;27:15-28.
  • 3Paulo Sousa,Carlos Ramos.A distributed architecture and negotiation protocol for scheduling in manufacturing systems[J].Computers in Industry, 1999;38 : 103-113.
  • 4K S Hong,K H Choi,J G Kim.A PC-based open robot control system:PC--ORC[J].Robotics and Computer Integrated Manufacturing,2001; 17 : 355-365.
  • 5A Soudani,S Nasri,T Divoux.QoS and network resources management for communication in distributed manufacturing processes[J].Computerin Industry ,2002 ;48:253-267.
  • 6R Boissier,E Gressier-Soudan,A Laurent et al.Enhancing numerical controllers,using MMS concepts and a CORBA-based software bus[J]. INT J Computer Integrated Manufacturing,2001 ; 14(6) :560-569.
  • 7M T Martinez,P Fouletier,K H Park et al.Virtual enterprise-Organisation,evolution and control[J].Int J Production Economics,2001 ;74 : 225-238.
  • 8Weiming Shen,D H Norrie.Agent-based systems for intelligent manufacturing : A State-of-the-Art survey[J].Knowledge and Information Systems, 1999; 1 (2) : 129-156.
  • 9Tapio Heikkila,Martin Kollingbaum,Paul Valckenaers et a.An agent architecture for manufacturing control:manAge[J].Computer in Industry, 2001 ;46:315-331.
  • 10Conner D A.Issues and Techniques in Networked-based Distributed Healthcare[J].Overview Journal of Systems Integration,2000,(10):81-94.

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部