浅谈超大钢筋混凝土预制柱的施工要点

Simple talking about the construction essentials of super huge reinforced concrete fabricated column
下载PDF
导出
摘要 严把钢筋、水泥等原材料的进厂质量关 ,控制钢筋制作、主筋焊接接头、钢筋骨架绑扎、铁件制作和混凝土拌合物等关键工序 ,有效保证了隐蔽工程质量。“活底脱模”施工技术的应用 ,实现了工厂化生产超大预制柱的流水作业 ,减少了投入 ,提高了工效。加强浇水养护阶段的保证措施 。 Through the control for the quality of the reinforcing steel bar and concrete and the procedure of construction the engineering quality can be ensured effectively. The application of ″free access under plat mold unloading″ construction technology realizes the continuous production of super huge reinforced concrete fabricated column. This technology reduces the investment and increases the work efficiency. The common quality default is shrinkage cracks that result from the losing of the water and strengthening the warranty measures in maintenance stage can eliminate the default. Finally author emphases that the fulfilling of the ″three level″ inspection regime is a essential measure to ensure the product quality.
机构地区 太钢建设四公司
出处 《山西建筑》 2002年第1期48-49,共2页 Shanxi Architecture
关键词 收缩变形 裂缝 超大钢筋混凝土 预制柱 工程施工 free access under plat sectionalized unloading, centralized agitation, shrinkage transformation, crack
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部