4FERRER F J.Commingled production wells:experiences in Lake Maracaibo,Venezu-ela[R].SPE 49 311,1998:801-808.
5KUPPE FRANK,SHELIN CHUGH,PAUL CONNELL.Material balance for multi-layered,commingled,tight gas reservoirs[R].SPE 59 760,2000:1-9.
6MARHOON-N.AI,AI-SHIDHANI.The challenges of predicting commingled production of rich and dry gas reservior of the Saih Rawl Field,Oman[C].SPE 81 440,2003:1-8.
7ARASHI AJAYI,MICHAEL KONOPCZYNSKI.A dynamic optimisation technique for simulation of multi-zone intelligent well systems in a reservoir development[R].SPE 83 963,2003:1-7.