摘要
以阳光发电有限责任公司 300MW燃煤机组为对象,分析了自动发电控制系统(AGC)的功能特点及控制思路,指出了影响AGC投运品质的若干问题,提出改善AGC技术指标和提高AGC运行可靠性的策略,对工程实践有重要的参考价值。
Performance features and control strategies of automatic generation control system for the 300 MW coal-fired unit of Yangguang Power Generation Co. Ltd. are analyzed. Several problems affecting its operation performances are discussed. And the measures for improving the operation quality and reliabilities are proposed, which offers a valuable reference for engineering practice.
出处
《华北电力大学学报(自然科学版)》
CAS
北大核心
2002年第1期109-111,共3页
Journal of North China Electric Power University:Natural Science Edition