摘要
针对三峡电站投产建成期不同水文典型年度湖北省网吸纳计划分配电量情况 ,结合省网最新建设“十五”计划和远景规划 ,对省网在不同水文年度条件下的电力电量平衡、调峰等问题进行综合计算 ,就系统运行届时可能出现的新特点进行分析并提出意见和建议。
Based on the planned power absorption of Hubei power grid from the Three Gorges Power Plant during different typical year in its long construction period,and the new Hubei power grid'the Tenth Five'plan,the balance calculation of Hubei power grid,the peak load regulation etc.Under different hydrology condition is carried out and for the new characteristics may appear,its analysis and corresponding opinions and suggestions for the Hubei power grid operation is put forward.