摘要
针对炼铁厂高炉大 (中 )修中所遇到的管理方面的施工单位多、高处立体交叉作业多、煤气区域作业长、拆除爆破作业及与其它高炉生产同时进行等实际问题 ,提出了从大 (中 )修开始到结束全过程层层负责、责任到人、强化管理、全方位安全监护、严格考核等实际有效的防范措施和管理方法。
To counter these practical problems of many construction units, many three-dimensional and cross operation at high space, long time work at gas area, dismantling explosion performance and carrying out the overhaul with the production of other blast furnaces at the same time,coming across in the management respect during the overhaul procedure of blast furnaces in the iron-making plant , the practical and affect prevention measures and management methods of being responsible at each level , ascertaining the blame onto persons , strengthening the management , safety guardianship at all positions and strict check and so on from start to finish of the overhaul are put forward
出处
《山东冶金》
CAS
2001年第6期20-22,共3页
Shandong Metallurgy
关键词
高炉
安全管理
保障措施
大修
blast furnace
overhaul
safety management
ensuring measures