摘要 铸管公司 3 #高炉料尺原采用主令控制器分段设定料线 ,由于机械故障频繁而影响了高炉的正常生产。为此采用XMR— 60 0高炉料位探尺 ,克服了主令控制器分段设定料线、分段数有限、精度低的缺点 ,实现了高精度、高可靠性、长寿命和料线的任意设定 ,从而保障了高炉可靠运行 ,减少了设备维修。 The charge level trail rod in No 3 blast furnace of the Casting Pipe Corporation originally used the main order controller to position the stock line in subsections affecting the regular production of blast furnace due to frequent mechanical failures For this reason XMR-600charge level trail rod of blast furnace was adopted to overcome the main order controllers' shortcomings of positioning the stock line in subsections; limiting the numbers of subsection and lower precision The higher precision, higher reliable, longer service life and random positing of stock line can be realized It ensures reliable production of blast furnace and reduces the maintenance of equipment
出处 《山东冶金》 CAS 2001年第6期70-71,共2页 Shandong Metallurgy
关键词 高炉 料线控制系统 料位探尺 主令控制器 PLC 炼铁 blast furnace stock line control system charge level trail rod main order controller PLC
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部