摘要
本文对大坝安全监测自动化改造的实施全过程(包括设计、设备和系统选型、土建施工、安装调试)做了叙述,结合漫湾工程介绍了实施经验,并对试运行情况做了简介。
Rehabilitation of the automatic Manwan dam safety monitoring system is described in this paper including the design, equipment & system selection, related civil work construction, and installation. The performance of the system after rehabilitation is also introduced.
出处
《大坝观测与土工测试》
2001年第5期25-27,共3页
Dam Observation and Geotechnical Tests