4周直. 大型工程项目实施阶段风险分析与管理研究[博士学位论文][D]. 上海:同济大学,1993.(Zhou Zhi. Risk analysis and management research on the large construction project in implementation period[Ph. D. Thesis][D]. Shanghai:Tongji University,China,1993.(in Chinese))
5Heinz Duddeck. Challenges to tunnelling engineers[J]. Tunnelling and Underground Space Technology,1996,11(1):5-10.
6沈国强. 影响建设项目经济效益的因素分析[硕士学位论文][D]. 上海:同济大学,1990.(Shen Guoqiang. Influential factor analysis on the economic benefit of construction project[M. S. Thesis][D]. Shanghai:Tongji University,1990.(in Chinese))
7Stuzk R,Olsson L,Uohansson U. Risk and decision analysis for large underground projects,as applied to the stockholm ring road tunnels[J]. Tunnelling and Underground Space Technology,1996,11(2): 157-164.
8Nilsen B,Palmstr?m A,Stille H. Quality Control of a Sub-sea Tunnel Project in Complex Ground Conditions[A]. In:Proc. of ITA World Tunnel Congress (99[C]. Oslo:[s. n.],1992. 137-145.