高混凝土坝两种典型枢纽布置型式比较

Comparison of Two Typical Key Layouts of High Concrete Dam Hydro-Junctions
下载PDF
导出
摘要 在高混凝土坝枢纽布置中,安全经济地解决枢纽的泄洪、消能问题对于枢纽布置有重要意义.围绕此问题,将枢纽布置概括为“离散”和“集中”两种型式,在分析其优缺点的基础上,提出采用“离散”型布置对于泄洪及减少施工干扰等有较大优势. It is important to safely and economically solve flood discharge and energy dissipation during the course of the key layout of high concrete dam hydro-junction. On the basis of analyzing the advantages and disadvantages,this paper emphasizes on this problem and uses two typical discreteness and concentration hydro-junction to summarize the key layouts. By using of discreteness form, good advantage can gain when controlling flood discharge and reducing the disturbance of construction.
出处 《三峡大学学报(自然科学版)》 CAS 2001年第3期209-212,共4页 Journal of China Three Gorges University:Natural Sciences
关键词 高混凝土坝 离散 泄洪 消能 枢纽布置 high concrete dam concentration discreteness flood discharge construction disturbance