摘要 小浪底泄洪、发电、引水等建筑物集中布置于左岸 ,该区域岩层软硬相间 ,各种结构面较为发育。通过对岩体各种可能滑动模式的稳定计算、有限元分析 ,并根据开挖施工中出现的具体情况 ,确定了对出口边坡采用以预应力锚索和抗滑桩为主的加固措施。施工中大量采用双层保护预应力锚索 ,在国内水利工程尚属首次。原型观测资料表明 ,处理效果好 ,边坡稳定。 The architectures of flood discharge, hydropower and water diversion were laid out on the left bank of the Xiaolangdi project. By many kinds of sliding mode stability calculation and finite element analysis of the rock body, they determined the outlet side slope strengthening measures mainly using prestressing anchors and resistance pile. The project was first one using prestressed anchors with double layer protect for construction in domestic hydraulic engineering. The prototype observation data proved that the procession effect is well and the side slope is stable.
出处 《广西水利水电》 2002年第1期29-33,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 预应力 锚索 抗滑桩 高边坡 小浪底工程 边坡 加固 prestressed anchors resistance pile high side slope the Xiaolangdi project
  • 相关文献

参考文献2

  • 1翟才旺 廖忠刚 等.小浪底工程中3000kN双层保护预应力锚索的设计与施工.中国岩土锚固工程协会、岩土锚固新技术[M].北京:人民交通出版社,1998..
  • 2水利部黄河水利委员会勘测规划设计研究院.黄河小浪底水利枢纽进出口高边坡施工期稳定性研究和加固技术[M].-,1998..

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部