石头湾水库土坝中间部位存在软弱夹层 ,力学指标低 ,但渗透性小 ,同时整个大坝的力学指标也均较差 ,使得加固方案较难实现。介绍了采用计算机技术进行大量的分析计算得出的最优加固方案 ,其正确性得到了实践的检验。
The middle part of the Shitouwan reservoir earth dam is on soft stratum and has the features of low mechanical index and little permeability. The mechanical index of the dam is worse and realizing the strengthening scheme is more difficult. The optimum strengthening scheme was gave out by computer calculation and analysis and it was proved right by practice.