全面完成2002年度三峡工程建设任务——2002年总公司工作会议工程建设部分工作报告

Construction of Project '2002
下载PDF
导出
摘要 The year 2001 was the first one of three years at crucial stage for the second-phase construction of the Three Gorges proect. The year 2002 will be a turning point. From now on, the reservoir will be water filled after 18 months and the first unit will be commissioned after 22 months. The master milestones on the construction schedule in 2002 are as follows: upstream water will be allowed through the upstream cofferdam in May and the downstream cofferdam in July; the shiplock will be tested and regulated without and with water in July and October, respectively; and the open diversion channel will be closed in November. The year 2001 was the first one of three years at crucial stage for the second-phase construction of the Three Gorges proect. The year 2002 will be a turning point. From now on, the reservoir will be water filled after 18 months and the first unit will be commissioned after 22 months. The master milestones on the construction schedule in 2002 are as follows: upstream water will be allowed through the upstream cofferdam in May and the downstream cofferdam in July; the shiplock will be tested and regulated without and with water in July and October, respectively; and the open diversion channel will be closed in November.
作者 贺恭
机构地区 中国三峡总公司
出处 《中国三峡建设》 2002年第2期13-15,52,共3页 China Three Gorges Construction
关键词 中国三峡总公司 2002年 会议报告 船闸 crucial stage cofferdam impoundment operation milestone shiplock open diversion channel.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部