为了保证高温气冷实验堆球形燃料元件可靠地输送,采用了传送管输送方法。本文介绍了10MW高温气冷堆(HTR-10)燃料元件气体输送系统的关键设备、管路设计及输送气体流量计算。通过初装料的运行,证明该系统运行良好。
In order to ensure spherical fuel elements to be transported reliably in 10MW high temperature gas cooled reactor(HTR-10), the method of pneumatic post is utilized. The key equipments, the design of tubes and the calculation of transportation gas flow are described. The operation of the first loading indicated that this system is reliable.