摘要
对仪化热电厂两种并网方式的利弊进行了比较分析,介绍了防止穿越功率转移的具体措施。同时阐述了自备热电厂在安全生产方面的若干特点。
The advantages and disadvantages between two ways of switching-in network about chp Plant of Yizheng Chemical Fibre Co.,Ltd are described.It indicates a concrete measure on avoiding penetration power drift.Meanwhile it expounds the features on safety in production about captive power plant.