摘要
欧洲北海输气管道隧道 (Landfall隧道 )全长 2 60 0m ,内径 3 .0m ,外径 3 .8m ,采用无人进入的遥控顶管法施工。本文介绍了该管道隧道的施工情况 ,并着重介绍了本隧道顶管施工所取得的技术进步。
Landfall tunnel of Europipe scheme under North Sea, with 2600m length, 3.8m outside diameter and 3.0m inside diameter, is constructed by means of non-man-entry remote-controlled pipejacking method. This article describes the construction of the gaspipe tunnel, with the emphasis of describing the technical progresses achieved in the tunnel pipejacking construction.
出处
《西部探矿工程》
CAS
2002年第1期87-89,共3页
West-China Exploration Engineering