摘要
本文论述了船坞采用“湿法”工艺施工中止水设施的设置及止水效果分析。经采用多种不同的止水结构,保证了坞内干施工的条件, 效果良好。
The paper reviews the arrangement of water stops for the wet construction of the dock and analyses the water sealing results. Various water stopping structures were used in the construction,thus ensuring satisfactory conditions for dry construction in the dock and obtaining good results.
出处
《中国港湾建设》
1999年第6期62-65,共4页
China Harbour Engineering