摘要
介绍了清江公司通过成功地组织隔河岩电站建设及高坝洲、水布垭电站开发的过程中创建的“清江体制”,即“以两权分离、两体融合的产权关系制度构架为核心 ;以生产要素优化配置的产业科学集成为主线 ;以不断提升企业科技、人才、管理水平为动力”的动态发展的公司体制。探讨了加入
Through the successful organization of Qingjiang Hydropower plant construction and development of Gaobazhou and Shuibuya projects the co called 'Qingjang Valley Structure' was established. Its nucleus is following:right separation of administration and enterprise; scientific intergration of production elements; dynamic development of scientific, manpower and management levels. Also was discussed the prospective plan of Qingjiang Co. development and Qingjiang Valley exploitation after the entry into the WTO.
出处
《水电能源科学》
2002年第1期1-5,共5页
Water Resources and Power
关键词
清江流域
水电滚动开关
技术管理
可持续发展
Qingjiang Valley
successive hydropower exploitation
Qingjiang structure
creation of technical management
sustainable development