介绍了龙羊峡水电站工程跨黄河大桥悬吊系的安装步骤和方法 ,以及施工控制措施和手段 ,并详细阐述了主索制备工艺及实际施工操作过程。
The authors present the installing steps and method, construction means and control measures of the Longyangxia Yellow River bridge, particularly the major cable preparation technology and actual construction process are described in detail.
出处
《西北水电》
2002年第1期40-41,66,共3页
Northwest Hydropower
关键词
加筋梁
悬索桥
悬吊系
安装
施工方法
龙羊峡水电站
stiff girder suspension bridge
installation of suspension cable system
cable preparation technology