摘要
本文主要分析介绍预分解窑生产工艺线预分解系统中出现堵塞的原因、堵塞的处理及防止堵塞所要采取的措施。
The reasons to the blockages occurred in the precalcining system of PC kiln process lines, the respective treatments and the measures necessary to avoid blockages are mainly introduced in the article.
出处
《水泥》
CAS
1991年第11期2-5,共4页
Cement