摘要
本文介绍了掺粉煤灰混凝土等强度试配、50℃海水快速养护试验、抗冻性试验、钢筋锈蚀试验及现场暴露试验等工作。并对山东龙口码头粉煤灰混凝土的试点工程概况做了介绍。
This paper presents a series of test results, including strength tests with various proportioning of mixture, fast curing test by 50℃ sea water ,antifreeze tests, rusrtng test for steel bars and in-situ test with samples exposed to air, etc. for the concrete mixed with coal dust. A general situation of constru ction work for the pilot project situated at Longkou wharf is also introduced.
出处
《水运工程》
北大核心
1991年第7期34-37,共4页
Port & Waterway Engineering