摘要
水电站的重大件设备运输是保证水电工程顺利开工、按时投产的一项关键任务。基于层次分析法建立了水电工程重大件设备运输方案的数学模型,以敦化抽水蓄能电站重大件运输线路的选择为例进行分析,得到运输路线的最佳方案。该模型在水电站重大件运输路线的选择问题中具有较强的实用性。
The transportation scheme of heavy cargo for large-scale hydropower project is a key task to guarantee the smooth construction and commissioning of station on time.The model for studying the transportation scheme of specific heavy cargo of hydropower project is established based on analytic hierarchy process approach.Taking the route choice of heavy cargo transportation for Dunhua Pumped-storage Power Station as an example,the best solution for the transportation route is obtained.The proposed model is practical in the route choice of heavy cargo transportation for large-scale hydropower project.
作者
胡意新
余卓轩
HU Yixin;YU Zhuoxuan(PowerChina Beijing Engineering Corporation Limited,Beijing 100024,China)
出处
《水力发电》
北大核心
2018年第12期67-70,共4页
Water Power
关键词
水电站
重大件运输
线路选择
层次分析法
hydropower station
heavy cargo transportation
path selection
analytic hierarchy process