摘要
针对掘进巷道在通过采空区时巷道支护困难的问题,应用普氏自然平衡拱理论计算冒落区,确定冒落区注浆加固技术参数。根据计算结果使用高分子注浆材料对巷道顶板冒落区进行加固注浆,使加固区域的破碎煤岩体与浆液共同形成固结圈,提高注浆区域围岩强度。经实例证明,采用高分子注浆加固材料进行注浆加固,片帮、漏顶现象明显减少,加快了巷道掘进速度。
Against difficulties in roadway support during tunnehng through goat,me tecnnlcal parameters of grouting reinforcement collapsed zone were determined by applying the Protojiakonov's theory of natural balance arch.According to the calculation results,using polymer grouting materials to reinforce the collapsed zone of the roadway'can make the joint formation of cracked coal-rock mass and the slurry,thus improve the strength of the surrounding rock in the grouting area.The examples verify that the phenomenon of the rib spalling and roof leakage are _obviously reduced and the speed of roadway excavation is accelerated by using polymer grouting reinforcement material
作者
张军波
李宁
ZHANG Jun-bo;LI Ning(School of Safety Science and.Engineering,Henan Polytechnic University,.Jiaozuo 454003,China;Henan Energy and Chemical Research Institute Co.,Ltd.,Zhengzhou 450046,China)
出处
《煤炭技术》
CAS
2018年第12期5-8,共4页
Coal Technology
关键词
采空区
掘进巷道
注浆加固
高分子材料
goaf
driving roadway
grouting reinforcement
polymer material