1580分卷线出口步进梁升降机构改进

Improvement of Lifting Mechanism for Exit Waling Beam in 1580 Coil Dividing Line
下载PDF
导出
摘要 针对步进梁升降机构(中间支座)在生产中存在螺栓断裂的问题进行了分析。分析,找出了原因。实施了改进,提高步了进梁运行的稳定性,保证生产顺行。 The bolts of the lifting mechanism(intermediate support )of moving beam were fractured in the production.For this problem,an analysis is made,and reason is found out.After implementing modification,the stability of the walking beam is improved,and a smooth production is ensured.
作者 董振宇 DONG Zhen-yu(Hot Rolling Department of Bayuquan Steel Company of Angang Steel Co.,Ltd.,Yingkou 115007)
出处 《冶金设备管理与维修》 2018年第6期44-47,共4页 Metallurgical Equipment Management and Maintenance
关键词 动梁 升降机构 中间支座 同步连杆 升降液压缸 Moving beam lifting mechanism intermediate support synchronous connecting rod lift cylinder