摘要
为提高广州站列车运行正点率,在阐述广州站运输组织现状的基础上,针对广州站目前存在的站场设备设施布局影响运输能力、列车到发不均衡使得高峰时段异常紧张、接发列车及中转换挂机车作业增多导致难度增大等问题,提出加强设备设施改造、优化列车运行图调整及强化站区各单位联劳协作等优化运输组织的对策,对确保广州站运输畅通具有实际意义。
To improve the punctuality rate of passenger trains,this paper expounds the present situation of transport organization at Guangzhou Railway Station,aiming at the existing problems in transport organization of the Station,such as the layout of equipment and facilities in the station yard influences the transport capacity,the intensive transport capacity in peck period caused by unbalanced arrival and departure,and the operation of receiving and departing trains and locomotive changing operation,which increases the difficulty degree of operation.This paper puts forward some measures to optimize the transport organization,including strengthening equipment and facilities transformation,optimizing the train diagram,adjusting and strengthening the units cooperation in different stations etc.All these measures have an actual meaning on ensuring transport smoothness of Guangzhou Station.
作者
邢云磊
XING Yun-lei(Guangzhou Station,China Railway Guangzhou Group Co.,Ltd.,Guangzhou 510010,Guangdong,China)
出处
《铁道运输与经济》
北大核心
2018年第12期13-17,共5页
Railway Transport and Economy
基金
中国铁路广州局集团有限公司科研项目(2016K94)
广东省教育厅2017年度科研项目(2017GKTSCSX055)
关键词
铁路
广州站
运输组织
运输能力
影响因素
Railway
Guangzhou Station
Transport Organization
Transport Capacity
Influence Factor