期刊文献+

基于承载力分析的公路隧道结构健康度评价方法 被引量:5

Health evaluation method of highway tunnel structure based on bearing capacity
原文传递
导出
摘要 目前针对松动荷载作用下隧道结构受力变形与损伤演化机制的研究相对较少,缺乏结构剩余承载力的量化分析依据,不利于结构健康度评价与维修处治方案的确定。针对上述问题,利用室内模型试验及数值仿真手段,研究不同围岩条件下结构受力变形规律及破坏特征,提炼结构健康评价关键指标,建立基于承载力的健康度分级标准。通过研究,提出:(1)拱顶松动荷载下衬砌破坏过程分为3个阶段,以拱顶开裂、主裂缝张开为分界点,破坏时拱顶内侧、拱腰外侧钢筋拉断,形成三铰拱体系;(2)衬砌结构承受相同荷载100kPa时,抗力系数1.58MPa/m的工况拱顶下沉3.3cm,抗力系数200MPa/m的工况拱顶下沉0.23cm;抗力系数从1.58MPa/m增大到200MPa/m时,极限承载力从196kPa增大到1840kPa;(3)以衬砌开裂、拱顶下沉3cm、拱顶钢筋屈服、拱腰钢筋屈服、拱顶钢筋拉断为关键节点,建立衬砌结构健康度的5级划分标准,并以拱顶下沉及边墙收敛作为简易评价指标,对V^VI级围岩,拱顶下沉控制值建议取5cm。 At present,the research on the deformation and damage evolution mechanism of tunnel structures under the action of loose load is relatively scarce,and the quantitative analysis of structural residual bearing capacity is lacking,which is not conducive to of structural health assessment and the determination of maintenance treatment program. For these problems,this paper studied the deformation regularity and damage characteristics of the structure under different surrounding rock conditions,summarized the key indexes of structural health assessment,established the standard of health classification based on bearing capacity through indoor model test and finite element analysis software. Through these researches,we can draw the following conclusions.(1) The failure process of the lining is divided into three stages,the arch cracking and the main crack opening as the dividing line. The inner side of the vault and the outside of the arch pull the steel bar apart,the structure turned into three-hinged arch at the same time.(2) Arch crown settlement is 3.3 cm with resistance coefficient 1.58 MPa/m and 0.23 cm with resistance coefficient 200 MPa/m under the same load of 100 kPa. Resistance coefficient increases from 1.58 MPa/m to 200 MPa/m,the ultimate bearing capacity increases from 196 kPa to 1 840 kPa.(3) Through taking lining cracking,crown sinking 3 cm,arch crown steel yield,arch haunch steel yield and arch crown steel breaking as key nodes,and taking crown settlement and side wall convergence as simple evaluation indexes,the 5 grade criterion of lining structure health degree is established. The control value of crown settlement for V–VI grade surrounding rock is suggested to take 5 cm.
作者 刘学增 郭乔堃 桑运龙 赵芳 周若阳 LIU Xuezeng;GUO Qiaokun;SANG Yunlong;ZHAO Fang;ZHOU Ruoyang(College of Civil Engineering,Tongji University,Shanghai 200092,China;Shanghai Engineering Research Center of Underground Infrastructure Detection and Maintenance Equipment,Shanghai 200092,China;Shanghai Tongyan Civil Engineering Technology Co.,Ltd.,Shanghai 200092,China;Civil Engineering Center of Ministry of Education Information Technology,Tongji University,Shanghai 200092,China)
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2018年第A02期4161-4169,共9页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金资助项目(51478342) 深圳市交通公用设施建设中心交通建设工程课题(20160318002B) 公路隧道快速检测车(18DZ2202300)~~
关键词 隧道工程 衬砌结构 健康度 松动荷载 承载力 tunnelling engineering lining structure health grade loose load bearing capacity
  • 相关文献

参考文献9

二级参考文献55

共引文献306

同被引文献44

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部