摘要
文章以牛岭水库工程为例,通过骨料平衡分析,确定砂石料开采加工工艺流程;采用工序单价法,分析砂石骨料单价的计算方法,确定成品砂石骨料的单价。
This paper takes the Niuling reservoir project as an example to determine the process flow of the sand stone mining process through the analysis of aggregate balance.The unit price method is used to determine the unit price of aggregate.
作者
井锦旭
JING Jin-xu(Auhui Survey and Design Institute of Water Conservancy and Hydropower,Hefei 230088,China)
出处
《安徽水利水电职业技术学院学报》
2018年第4期25-28,共4页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
砂石料
开采工艺
工序单价法
工程造价
sand and gravel aggregate
production practice
unit price
project cost