摘要
如果给排水设计人员对现场的前期调研不足,后期现场跟进不及时,将会影响施工进度,导致一些设计工作形同虚设,无法与实际施工需求紧密结合。因此,将给排水设计与施工紧密结合,对市政工程建设尤为重要。论文从工程前期、中期和后期分别论述给水设计与施工的关系,以供参考。
Because of the relative independence of the municipal engineering, the buried depth of water supply and drainage pipeline is larger than the other pipelines. Even if the design contents the corresponding specifications, the water and drainage designers are not enough to investigate the site, the later field follow-up is not timely, and it will also affect the construction progress. This will cause some design work still in name only, and cannot be closely integrated with the actual construction needs. Therefore, the combination of water supply and drainage design be on good terms with construction is particularly important for municipal engineering construction. This paper analyzes the relationship between design and construction of water supply and drainage from the stages of before construction, in construction and after construction, for reference.
作者
李萍
LI Ping(China Roads Transportation Technology Group Co.Ltd.Yinchuan Branch,Yinchuan 750001,China)
出处
《工程建设与设计》
2018年第24期110-111,共2页
Construction & Design for Engineering
关键词
市政工程
管道综合
管道埋深
municipal engineering
pipeline synthesis
pipeline depth