摘要
麻石水电扩建工程由河床式厂房、左侧混凝土坝、右岸接头土坝、引水渠、尾水渠等建筑物组成。结合地形地质条件及麻石水电站原有建筑物,介绍了麻石水电站扩建工程枢纽布置及必选过程,最终选择了斜摆的厂房布置方案。
The expansion project consists of riverbed workshop,left concrete dam,right bank joint earth dam,drainage channel and tailings canal.Combined with the topography and geological conditions and the original building ofMashi hydropower station,this paper introduces the layout and selection process of the expansion project ofMashi hydropower station.Finally,the inclined-pendulum layout scheme is selected.