期刊文献+

麻石水电站扩建工程枢纽布置设计

The Hub Layout Design of the Expansion Project of Mashi Hydropower Station
下载PDF
导出
摘要 麻石水电扩建工程由河床式厂房、左侧混凝土坝、右岸接头土坝、引水渠、尾水渠等建筑物组成。结合地形地质条件及麻石水电站原有建筑物,介绍了麻石水电站扩建工程枢纽布置及必选过程,最终选择了斜摆的厂房布置方案。 The expansion project consists of riverbed workshop,left concrete dam,right bank joint earth dam,drainage channel and tailings canal.Combined with the topography and geological conditions and the original building ofMashi hydropower station,this paper introduces the layout and selection process of the expansion project ofMashi hydropower station.Finally,the inclined-pendulum layout scheme is selected.
作者 谢心恒 XIE Xin-heng(China Energy Construction Group Guangxi Electric Power Design and Research Institute Co.Ltd.,Nauning 530007,China)
出处 《工程建设与设计》 2018年第24期157-158,共2页 Construction & Design for Engineering
关键词 麻石水电站 扩建工程 枢纽布置设计 Mashi hydropower station expansion engineering hub layout design
  • 相关文献

参考文献2

二级参考文献1

  • 1广西电力工业勘察设计研究院.麻石水电站第二次大坝安全定期检查设计复核报告[R].南宁:广西电力工业勘察设计研究院,2002.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...