期刊文献+

浅析工期的影响因素和对策

Analysis on the Influence Factors of Construction Period and the Countermeasures
下载PDF
导出
摘要 工程项目的进度控制涉及投资商及参建各方的利益,是能否顺利执行合同内容的关键和衡量项目管理水平的标志。通过对进度的控制,可以减少各方的相互干扰,不仅能有效缩短项目建设工期,提前项目运营,而且能降低项目投资和减小参建各方成本,确保进度、质量、安全目标的顺利实现,为防止各方提出索赔提供依据。论文对影响进度的因素进行分析,并提出了保证工程进度的对策浅析。 Project progress control involves the interests of investors and all parties involved in the construction.It is the key to the smooth implementation of the contract and the symbol to measure the level of project management.Controlling the progress can reduce the mutual interference of all parties.It can not only shorten the construction period of the project effectively and advance the operation of the project,but also reduce the investment of the project and the cost of all parties involved in the project,ensure the smooth realization of the progress,quality and safety objectives,and provide a basis for preventing all parties from lodging claims.The paper analyzes the factors that affect the progress, and puts forward the countermeasures to ensure the progress of the project.
作者 温定煜 WEN Ding-yu(Sinohydro Bureau 5 Co.Ltd.,Chengdu610066,China)
出处 《工程建设与设计》 2018年第24期236-238,共3页 Construction & Design for Engineering
关键词 工期 影响因素 对策 construction period influence factors countermeasures
  • 相关文献

参考文献1

二级参考文献7

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部