摘要 针对原型管片结构试验中站立式管片拼装方法难度高的问题,提出一种适用于异形盾构管片结构试验的加载框架设计方案,并介绍异形盾构管片加载试验框架和管片拼装方法。结合试验数据,给出自重状态和设计状态下异形管片结构力学和形变特征,确定管片结构自重对其内力和形变的重要影响,证明异形盾构管片站立式试验方法的科学性。 Since the existence of the difficulty in the standing assembling method for the prototype loading tests on the segmental structure, a design scheme of the loading frame for the special-shaped segments was proposed, and the assembling process of the loading frame and the segments was illustrated in detail. Then, the mechanical and deformation characteristics of the special-shaped shield lining under the dead weight state and designed state were given according to the test data, which determined the significant influence of the self-weight and verified the scientificalness of the standing test method.
作者 朱叶艇 ZHU Yeting(Shanghai Tunnel Engineering Co.,Ltd.,Shanghai 200233,China;Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China)
出处 《施工技术》 CAS 2018年第24期14-17,63,共5页 Construction Technology
基金 上海市国资委企业技术创新和能级提升项目(2013017)
关键词 隧道工程 盾构 试验 拼装 施工技术 tunnels shields testing assembly construction