桩基托换中顶升荷载对新旧结构的影响研究

The Influence of the Jacking Load on the New and Old Structures in the Process of Pile Foundation Underpinning
下载PDF
导出
摘要 利用ABAQUS有限元软件对郑州轨道交通5号线的桩基托换项目进行模拟研究,在截桩前对原上部结构进行的预顶升,由于顶升过程对桥台和托换梁以及新桩和旧桩影响方式是不同的,分别分析得出顶升过程对原结构和托换结构的影响特点。 In this paper, the ABAQUS finite element software is used to simulate the pile foundation underpinning project of Zhengzhou rail transit line 5. Before cutting pile, the upper structure need to be jacked, the jacking process has influence on the abutment, underpinning beam, new pile and old pile, and the influencing methods are different. Paper analyzes the influence characteristics of the original structure and the new underpinning structure in the jacking process.
作者 何伟 康延铭 张健 徐志军 HE Wei;KANG Yan-ming;ZI-IANG Jian;XU Zhi-jun(Zhengzhou City Rail Transit Co.Ltd.,Zhengzlaou 450000,China;School of Civil Engineering and Architecture,Henan University of Teehnology,Zhengzhou 450001,China)
出处 《工程建设与设计》 2019年第1期50-52,共3页 Construction & Design for Engineering
关键词 桩基托换 有限元模拟 顶升荷载 pile foundationunderpinning finite element modeling jacking load
  • 相关文献

参考文献1

二级参考文献8

共引文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部