摘要
利用ABAQUS有限元软件对郑州轨道交通5号线的桩基托换项目进行模拟研究,在截桩前对原上部结构进行的预顶升,由于顶升过程对桥台和托换梁以及新桩和旧桩影响方式是不同的,分别分析得出顶升过程对原结构和托换结构的影响特点。
In this paper, the ABAQUS finite element software is used to simulate the pile foundation underpinning project of Zhengzhou rail transit line 5. Before cutting pile, the upper structure need to be jacked, the jacking process has influence on the abutment, underpinning beam, new pile and old pile, and the influencing methods are different. Paper analyzes the influence characteristics of the original structure and the new underpinning structure in the jacking process.
作者
何伟
康延铭
张健
徐志军
HE Wei;KANG Yan-ming;ZI-IANG Jian;XU Zhi-jun(Zhengzhou City Rail Transit Co.Ltd.,Zhengzlaou 450000,China;School of Civil Engineering and Architecture,Henan University of Teehnology,Zhengzhou 450001,China)
出处
《工程建设与设计》
2019年第1期50-52,共3页
Construction & Design for Engineering
关键词
桩基托换
有限元模拟
顶升荷载
pile foundationunderpinning
finite element modeling
jacking load