既有大型旧厂房主体结构快速改造技术研究

Research on Rapid Reconstruction Technology for Main Structure of Existing Large Old Factory Building
下载PDF
导出
摘要 原上海第二钢铁厂东区三标段主体结构改造工期要求非常紧张。通过对标段内的工作量进行研究分析,确定了整个标段实施的重点,并在施工过程中采取多个工艺优化措施,最终在不增加造价的前提下满足了建设单位的工期目标,对今后类似的改造工程具有较大的借鉴意义。 The reconstruction period of the main structure of the third bidding section in east area of Shanghai No. 2 Steel Plant is very limited.Through a research and analysis of the workload within the bidding section,the key implementation points within the whole bidding section are determined.Meanwhile,multiple process optimization measures are taken during the construction process.Finally,the target of construction period of the construction unit is met without increasing the cost,which have larger reference significance to similar reconstruction projects in the future.
作者 宋一帆 SONG Yifan(Shanghai Construction No.7 (Group)Co.,Ltd.,Shanghai 200050,China)
出处 《建筑施工》 2018年第12期2121-2123,共3页 Building Construction
关键词 产业升级 厂房改造 工艺优化 设计调整 industrial upgrading factory building reconstruction process optimization design adjustment
  • 相关文献

参考文献5

二级参考文献9

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部